The initial evaluationof flood risk in Dłubnia river catchment

key words: hydrological monitoring, cross-section, rating curve, flows with probability of exceedance

Summary:

The aim of the paper was to study an initial evaluation of flood risk of Dłubnia river catchment, on section from its sources to Zesławice reservoir. The aim was realized basis on calculations of flows with probability of exceedance in eight cross-sections on Dłubnia river and its inflows. In these cross-sections a group of authors is planning installation of automatic water stage stations. In two of them in autumn of 2014, there were already installed devices for automatic water stage measurement. In all cross-sections, basis on made geodesic measurements, the maximum capacity was made, which was then compared with values of flow with probability of exceedance. Got results were basis to study an initial evaluation of flood risk in Dłubnia river catchment. It was shown, that flows with probability of exceedance equal 20% are not within in the stream channel and its inflows, what signalizes a flood risk.

Citation:

Michalec B., Wałęga A., Cupak A., Michalec A., Połoska-Wróbel A. 2016, vol. 13. The initial evaluationof flood risk in Dłubnia river catchment. Infrastruktura i Ekologia Terenów Wiejskich. Nr 2016, vol. 13/ I (1 (Mar 2016))