Reological characteristics of sedimentation process and erosion of river sediments

The authors performed an estimation of the dynamic of the river bed changes caused by sedimentation and erosion processes. The physical and rheological parameters for chosen cohesive and semi-cohesive sediments were investigated. Mud samples were taken from 3 different localisation on Middle Odra (Poland) and from 2 localisations on Warnow river (Germany). Rheological characteristics were studied with use of the rotative viscometer. Erosion characteristics of the mud’s were studied accordingly to methodology of Migniot [1968]. Results for Middle Odra were verified in the natural scale during the passage of the catastrophic flood through barrage Brzeg Dolny in 1997. This flood caused partly erosion of mud’s from the upstream part of this barrage. ...

The importance of sedimentation process for treatment of rainfall sewage from urbanized areas

The problem of reducing the negative impact of rainfall sewage on ground and water environment has been the subject of research and scientific papers for many years. It becomes more and more frequently an inherent part of planning and projects of sewer systems in the anthropologically transformed areas. Non-point sources of pollution are one of the main causes of water quality degradation. Traffic and washing out the sediments deposited in sewer pipes have the most serious influence on pollutant contents in rainfall runoffs. Therefore, characterization of pollutants in rainfall sewage is necessary for preparing plans of water management in urbanized catchments. The article aims at an assessment of the sedimentation process effect on reduction of pollutants from rainfall sewage. Sewage samples for analyses were collected from the roadside ditches at Pułłanki street in Kraków-Bieżanów in April 2003 and February 2004 during surface runoff observations. After 120 minutes of sedimentation, the following pollution indices were determined in the collected raw sewage samples: BOD5, CODCr and total suspended solids, sporadically phosphates, whereas after 15, 30 and 60 minutes of sedimentation only total suspended solids and CODCr were assessed. The analyses revealed the usefulness of sedimentation process for pollutant reduction from rainfall sewage. ...